Infocus lp610 Installationsanleitung

Seite von 26
5
3
Place the ceiling plate or pipe extension in the 
ceiling so that the base box hangs down into 
the room. 
WARNING: The cables 
are not rated for use in 
air-handling plenums. If 
the dropped ceiling is an 
air-handling plenum, the 
cables should be installed 
within conduit.
4
Route the projector’s cables through your 
ceiling and out the hole in the ceiling 
(
NOTE: When the projec-
tor is mounted on the ceil-
ing from the LiteMount 
False Ceiling Plate, it 
descends 12.25 inches 
(31 cm) from the ceiling. 
F
IGURE
 2
Install the base box to the LiteMount False Ceiling Plate
010-0132-02-eng-ger.fm  Page 5  Monday, March 31, 1997  11:23 AM