Cisco Cisco Packet Data Gateway (PDG) Installationsanleitung

Seite von 317
  Applying Power and Verifying the Installation 
Verifying the Installation  ▀   
 
ASR 5000 Installation Guide  ▄  
 
   
183 
Figure 59.  RCC LEDs 
 
RCC Run/Fail LED States 
The RCC Run/Fail LED indicates the overall status of the card. This LED is illuminated steady green during normal 
operation. 
If the LED is not green, use the troubleshooting information in the table to diagnose the problem. 
Table 77. 
RCC Run/Fail LED States 
Color
 
Description
 
Troubleshooting
 
Green  Card powered with no errors detected  None needed.  
Red 
Card powered with error(s) detected 
Errors were detected during the POSTs. It is likely that the errors were 
logged to the system's command line interface during the boot process. 
None 
Card powered with error(s) detected 
Verify that the POWER LEDs on the PFUs are green. If they are not, refer 
to 
 for troubleshooting information. 
Verify that the power source is supplying ample voltage and current to the 
chassis. 
Verify that the card is properly installed per the instructions in this 
document. 
If all of the above suggestions have been verified, it is possible that the 
RCC is not functional. Please contact your service representative.