Cisco Headend System Release 2.7 Wartungshandbuch

Seite von 202
 
 
 
Calculate and Change the OOB CVT Message Cycle Time 
 
4024836 Rev D 
71 
 
Calculate and Change the OOB CVT Message 
Cycle Time 
This section describes how you can determine and change the out-of-band CVT 
message cycle time for your system. 
Important: Only use this procedure if you are using bootloader version 1.21 or 
earlier. 
 
Calculate the OOB CVT Message Cycle Time 
We have determined that the optimal cycle time for transmission of OOB CVT 
messages is one-half the cycle time of the bootloader carousel plus one minute.  
Adjusting the cycle time of the CVT messages allows you to decrease the staging 
times for CableCARD modules. 
 
Calculating the Optimum OOB CVT Message Cycle Time 
Important:
 The procedures contained in this document should be repeated 
whenever you add or remove files from your bootloader carousel. 
The optimal cycle time for transmission of OOB CVT messages is one-half the cycle 
time of the bootloader carousel plus 1 minute (in seconds), or ((bootloader/ 2) + 60).  
Follow these steps to calculate the optimum CVT message cycle time for your 
system: 
1  Generate a Doctor report. 
2  In the Doctor report, locate the section with the heading BFS Carousel and OSM 
Sessions Status
3  Locate the bootloader entry (or entries) and obtain the bootloader cycle time 
from ACCT column. The time is listed in minutes:seconds. 
Example: 
BFS Carousel and OSM Sessions Status
 
============================================================
 
Reporting for site DNCS
 
 
=Datarate=
 
=KBytes=
 
=Intrvl=
 
=Enabled=
 
=ACCT=
 
OK: 
bootloader
 
IB  s( 199) up 
 
3.00 Mbps
 
10810.000
 
100
 
Yes
 
4:48