Chapter 3 What Are the Site Requirements for SR 2.7?
38
4012155 Rev B
Upgrade Logistics
Introduction
This section contains information that can help system operators plan the upgrade to
SR 2.7.
SR 2.7.
Supported Upgrade Path
Note these important upgrade requirements:
Systems that upgrade to SR 2.7 must currently be operating with system
software from SR 2.2 or SR 3.2, or later, as well as DHCT client operating system
(OS) 3.1 or later. The upgrade software is contained in a UniPack due to
significant changes contained in SR 2.7 and other time saving factors. Rollback
procedures and software are included in the UniPack installation instructions in
the event that the upgrade is unsuccessful.
software from SR 2.2 or SR 3.2, or later, as well as DHCT client operating system
(OS) 3.1 or later. The upgrade software is contained in a UniPack due to
significant changes contained in SR 2.7 and other time saving factors. Rollback
procedures and software are included in the UniPack installation instructions in
the event that the upgrade is unsuccessful.
Cisco field service engineers or the system operator must have already installed
the DNCS Utilities software onto the DNCS and should have already run the
pre-upgrade checks to ensure system compatibility with SR 2.7 UniPack upgrade
requirements. Refer to DNCS Utilities Installation and Operation Guide for
instructions on installing and executing the DNCS Utilities.
the DNCS Utilities software onto the DNCS and should have already run the
pre-upgrade checks to ensure system compatibility with SR 2.7 UniPack upgrade
requirements. Refer to DNCS Utilities Installation and Operation Guide for
instructions on installing and executing the DNCS Utilities.
Important: With the release of SR 2.7, Cisco introduces Live Upgrade with the
Unipack. Through the use of Live Upgrade, engineers can upgrade an Enterprise 450
and Sun Fire V880 server without shutting down the system processes until you
activate the new system software.
Unipack. Through the use of Live Upgrade, engineers can upgrade an Enterprise 450
and Sun Fire V880 server without shutting down the system processes until you
activate the new system software.
Time to Complete
The actual upgrade to SR 2.7 must be completed from within a maintenance window
that usually starts around midnight. A few pre-upgrade procedures, consisting
mainly of system checks, backups, and various operations upon the metadevices of
the DNCS, can be completed before the maintenance window begins.
that usually starts around midnight. A few pre-upgrade procedures, consisting
mainly of system checks, backups, and various operations upon the metadevices of
the DNCS, can be completed before the maintenance window begins.
Cisco engineers have determined that a typical site can be upgraded within one
maintenance window. See Scheduling Requirements (on page 42) for additional
details.
maintenance window. See Scheduling Requirements (on page 42) for additional
details.
System Performance Impact
Interactive services will not be available during the maintenance window.