Cisco Cisco MDS 9000 NX-OS Software Release 5.2 Informationshandbuch

Seite von 3
 
Rick Leonard, Vendor Services Lab Manager 
System z® Hardware Development 
International Business Machines Corporation 
 
Page 3 of 3 
 
The following table contains the test cases run against the Cisco switches and directors during IBM’s testing: 
Test Case Name 
Test 
Complete 
Test Case Description 
  
  
  
Unit Level Tests 
 
 
 
 
Verify concurrent code load, power requirements, port swap, IML, 
LPAR act./deact... 
Fabric Security and Fabric Event Notification 
Tests 
 
 
 
 
Basic security tests for cascaded switches and fabric change 
notification (RSCN) tests in different configurations. This testing 
should be implicit (completed while doing other work). 
CEC IMLs 
 
 
 
 
Run EXEC that does system resets forcing light on channels up 
and down 
Mixed Workload Test 
Combination of SAK and z/OS runs made in an LPAR 
environment with several partitions. 
EXPING/INGCTV all configurations 
SAK exerciser for FTV (emulated I/O) which checks basic 
architecture. 
SAK EXCITE / ICTVDR Non-RCV 
DPU with Real I/O Tape and DASD 
EXCITE runs traffic at a maximum data rate (data pusher mode) 
followed by traffic with halts, clears, and resets.  In recovery mode 
the program may also inject interface errors. The program is run 
with a high ratio of output ports in order to maximize switching. 
ITAPE0, IFTAPE, ITAPEX 
  
SAK EXCTCP / IOCTCP 
SAK exerciser for FICON CTC. 
All Applicable SAK EXDASD 
(IDASD0,IDSCAN,IDASDX) 
Includes IDASD0, IDASDX, UDESSI all run to 2105-800/DS-
8000/DS-6000 to maximize data transfer. 
SAK OFCPIO, OSASF 
FCP I/O driver program under SAK. 
PAWS (not SAK) 
Stand alone FCP test program. 
CHNLDRVR 
 
 
 
 
z/OS program to drive data on FICON channels. 
Verify 4, 8, and 10 Gb/sec speed on ports 
 
 
 
 
Verify 4, 8, and 10 Gb/sec port speed with Finisar analyzer 
Verify 8 Gb to 4 Gb/sec Auto-negotiation 
Verify 8 Gb to 2 Gb/sec Auto-negotiation 
 
 
 
 
Test auto-negotiation from 8 Gb/sec to x Gb/sec. 
New Switch ==> Old Switch 
New switch ==> Shark 
New Switch ==> CEC 
Extend 2 Gb/sec ISL on CWDM 
 
 
 
 
Extend 2 Gb/sec ISL up to 100 km through a CWDM 
Extend 4 Gb/sec ISL on CWDM 
 
 
 
 
Extend 2 Gb/sec ISL up to 40 km through a CWDM 
Extend 4 Gb/sec ISL on DWDM 
 
 
 
 
Extend 4 Gb/sec ISL up to 300 km through a DWDM 
Extend 10 Gb/sec ISL on DWDM 
 
 
 
 
Extend 10 Gb/sec ISL up to 100 km through a DWDM with 
DWDM optic and 300 km with DWDM transponder 
 
Extend FCIP Link 
 
 
 
 
Verify FCIP Link traffic with Anue tester for distance up to 300 km. 
NPIV 
 
 
 
 
NPIV tests to verify RSCN counts 
Serviceability Test 
 
 
 
 
Fail different cards in switch to make sure error reporting is 
correct. 
May require cards or code from vendor to allow error injection. 
SAK IRNDUP Single LPAR, Multi-channel Path, 
Single Switch Partition, Multiple Copies, Split Port 
Range, and FAF 
 
 
 
 
SAK exerciser for switch CUP functions. A CU exerciser for the 
CUP. Run on 2 partitions with 2 paths from each (requires MULT 
parm). 
SA OS/390 (I/O Ops) 
 
 
 
 
This is the real program used for "in band management" of the 
fabric through the CUP feature under z/OS. 
Improvised Testing 
 
 
 
 
This is additional testing initiated by the Test Team Leader which 
is intended to uncover latent problems in the equipment under 
test. 
Regression 
 
 
 
 
Verify that no breaks in code were introduced while fixing 
problems found during test.