Samsung AQV12PSCN Benutzerhandbuch

Seite von 43
35
ENGLISH
3.  Connect the charging hose of the low-pressure side of manifold gauge to a 
gas service port as seen in the picture.
4.  Open the valve of the low pressure side of manifold gauge counterclockwise.
5.  Purge the air in the connected pipes using the vacuum pump for about  
15 minutes. 
 
   Make sure that pressure gauge shows -0.1MPa(-76cmHg) after about 
10 minutes.  
This procedure is very important to avoid a gas leak. 
 
   Close the valve of the low pressure side of manifold gauge clockwise. 
 
   Turn off the vacuum pump. 
 
   Check for 2 minutes if there is any pressure change.
 
   Remove the hose of the low pressure side of manifold gauge.
6.  Set a valve cork of liquid and gas service port to the open position.
7.  Mount the valve stem nuts and the service port cap to the valve, and tighten 
them at the torque of 183kgf•cm with a torque wrench.
8.  Check for a gas leak paying particular attention to the 3-way valve’s stem nuts 
and to the service port cap (Refer to page 37).
Vacuum 
Pump
Manifold gauge
Valve
Gas service port 
<Low pressure> 
Liquid service port 
<High pressure> 
(Backward flowing 
prevention)
•   The remaining air in the Refrigeration cycle, which contains moisture, may cause malfunction on the compressor.
•   Always contact the service center or a professional installation agency for product installation.
B
(liquid)
Stem nut
Valve stem
A
(Gas)
Add refrigerant charge according to table below:
If you use a pipe longer than 5m,
‘15’g of refrigerant R410A must be added for each extra meter.
If you use a pipe shorter than 5m,
The purge time is normal.
Refer to the Service Manual for further details.
Adding Refrigerant