Place the “maintenance switch” manual bypass on the 
back of the UPS in the “bypass” position. To do this, first
remove the 4 screws of the cover (no.3, p. 26/27). 
Put the mains input miniature circuit breaker (no. 2, 
p. 26/27) in the “OFF” position.
Connect the UPS terminal “
/ PE “ 
(earth) 
with 
the 
corresponding earth terminal in the distribution cabinet.
Connect  the  supply  cable  from  the  MI  distribution  to  the 
terminals 1.1 of the UPS that are marked with “INPUT”:
     / PE
 = 
Ground
 = 
Neutral conductor
L1/L2/L3  = 
Phases
Check  the  jumper  between  “JP1”  and  “JP2” 
(terminal designation “JUMPER”).
Only remove the cable if you want to use the UPS
in parallel operation with further PROTECT 1. units 
of the same type (see also chapter 9).
5.4.3
Preparation of the Output Cabling
Before you connect the loads to the UPS, the nominal output 
listed  on  the  nameplate  must  be  greater  than  or  equal  to  the 
sum of the load power outputs.
The  output  of  the  PROTECT  1.  should  supply  further  separate 
circuits  in  a  subdistribution.  Make sure  that  the fuse  protection  is 
selectively designed (see also chapter 5.2.2).
For  the  connection  between  the  PROTECT  1.  and  the 
subdistribution,  cable  cross-sections  acc.  to  the  table 
“Connection  Cross-Sections  and  Fuse  Protection”  on  p. 30
must  be  used.  In  the  subdistribution,  note  at  least  the 
following information:
Maximum permissible total load
Maximum permissible load of the individual load circuits
i
In the case of a common distribution cabinet
(circuits with mains as well as UPS voltage), label 
each circuit with the respective supply (mains or 
UPS).