Gateway 7450R Benutzerhandbuch

Seite von 124
54
          Gateway 7450R Server System Manual
5
Install the new control panel board by replacing the three screws you 
removed in Step 4.
6
Plug the front panel cables into the appropriate connectors on the control 
panel board.
7
8
Reconnect the power cord and the external peripherals, then turn on the 
system.
Replacing the hot-plug backplane
The three drive hot-plug backplane is at the back of the hot-plug drive cage. 
The backplane supports as many as three hot-swappable Ultra3 SCSI drives.
 To replace the hot-plug backplane assembly:
1
Turn off the system and disconnect the power cord and all external 
peripheral devices.
2
3
Disconnect all cables to the hot-plug backplane. Note their locations and 
orientations.
4
Remove all hot-plug drives. Be careful to note which drive was in which 
slot.
8507328.book  Page 54  Thursday, February 15, 2001  11:28 AM