GE zv881wss Benutzerhandbuch

Seite von 16
12
Installation
Professional Vent Hoods
5
Step
Connect
Electrical
Verify that power is turned off at the source.
CAUTION
If house wiring is not 2-wire with a
ground wire, a ground must be
provided by the installer.
When house wiring is aluminum,
be sure to use U.L. approved anti-
oxidant compound and alumi-
num-to-copper connectors.
WARNING
• Connect white lead to branch circuit white
lead.
• Connect black lead to branch circuit black
lead.
• Connect green lead to branch circuit green
or bare ground lead.
• Secure all connections with wire nuts on
each electrical connector.
Duct Tape
Over Seam and Screw
Screw
Air
Flow
Cut a length of duct to connect hood flange to
the ductwork.
• Install ductwork, making connections in
direction of airflow as illustrated.
• Secure joints in ductwork with sheetmetal
screws.
• Wrap joints with duct tape for airtight seal.
Transition duct pieces are available for 48"
wide models.
ZX48AY, 4-1/2" x 18-1/2" transition to 10"
round straight up exhaust.
ZX48BY, 4-1/2" x 18-1/2" transition to 10"
round direct to rear exhaust.
Call your GE Dealer to order.
Connect
Ductwork
Step
6
Hold the liner below the installed hood.
• Reconnect the male/female connector plug
to heat lamp and one to blower.
• Carefully, slide liner into installed hood.
• While holding in place, re-install the original
screws. Make sure that all screws have been
re-installed.
• Re-install light assembly with original screws.
7
Step
Reassemble
Hood
Reconnect Male/Female
Connector Plug
Connect to
Junction Box
Replace Screws That 
Hold Inner Liner in Place.
To Blower Motor
Hood Inner Liner