Hoyt compound-2000 Benutzerhandbuch

Seite von 24
13
fig 8
(One Cam and Two Cam Glide Installation)
The glide is then inserted over the cable guard
bar so that the cables are on the inside of the
bar. 
Note: If you have trouble pulling the cables
back far enough to get the glide over the end of
the cable guard bar you will need to use a bow
press.  Hoyt USA recommends that this be done
by a qualified Pro Shop as a bow press may be
required.
TILLER ADJUSTMENT
Tiller is the difference in actual distance
between the upper limb to the string and lower
limb to the string measured from the base of
the limbs (where the limb and riser meet) at a
90 degree angle. (See fig 9)
Single cam models must be measured from a
reference line from axle to axle.  (See fig 10)
One Cam
Installation
Two Cam
Installation