1)  Remove the stainless steel top cover from 
the unit which is to become the bottom 
unit. 
2)  Screw into place the insulation panel over 
the fibre insulation (folded edge forward), 
locating the rear slots of the panel with the 
holes in the chassis member. 
3)  Drill two additional holes through the side 
members to locate with the remaining two 
holes in the insulation panel. 
4)  Locate and attach duct assembly onto top 
of the bottom unit’s flue. 
5)  Unbolt the four legs of the base unit and 
replace with the short legs supplied. 
6)  Remove the legs and leg frame from the 
G1100 top unit. 
7)  Remove the back panel from the top unit. 
8)  Cut out slots in base panel of top unit for 
chimney (refer figure A.2). 
9)  Insert and attach chimney assemblies with 
2 screws each. 
10) Fit side spacers and front cover to bottom 
of top unit. 
Figure A.2 
 APPENDIX A.  DOUBLE STACKING INSTRUCTIONS 
11) Stack  the  units,  ensuring  chimney  and 
duct are aligned and spacers line up with 
holes in sides of bottom unit, and secure 
with screws provided. 
12) Attach  rear  spacer  and  re-fit  the  back 
panel on the top unit 
Figure A.1 
Double Stacking Kit - part number 016393