Bazooka BPB24 Party Bar Benutzeranleitung

Seite von 4
When using the Intergrated Mounting Rail System, 
first determine your mounting stud spacing then screw 
the 6mm X 40mm studs (10) into the mounting nuts. Mark 
your desired spacing onto the flat surface to which you are 
mounting. Use a 1/4” or 7mm drill bit to drill mounting holes. 
Mount the Party Bar to your mounting surface using the 6mm 
washers (8) and 6mm nylon locking nuts (9) provided in 
hardware kit. You can also use our optional PR-URM, PR-FRC175,
and PR-FRC200 clamps (sold separately) to mount to round 
tubbing. When mounting the bottom half of the clamps to 
the Party Bar, you will need to use the 2 ea. 6mm X 12mm low 
profile socket head cap screws. (6)      
Use the 8mm X 12mm bolts (5) to attach
the mounting legs. Mounting legs (3) can 
be installed in ether direction depending 
on space constraints.  When mounting with 
opional clamps (PR-URM, PR-FRC200, and 
PR-FRC175) use the hex bolts provided with
the clamps to mount the bottom half of the
clamps to the mounting legs.
PR-FRC200  
2” Clamp
PR-FRC175 
1.75” Clamp
PR-URM 
2” - 1.5” Clamp
Warning:
If you are using the cast aluminum mounting legs to secure the Party Bar to your machine, the mounting legs must 
FIRST be attached and tightened to the Party Bar before mounting it to your machine. Attaching the legs to the 
machine first and then inserting the Party Bar between them can cause misalignment, spacing, and torque issues 
that can cause damage to the mounting assembly resulting in a failure.
Intergrated Mounting Rail Options
See Warning Below!
End Mounting Options 
with  Cast Aluminum Legs
BPB24 / BPB24-DS
           BPB36
Installation Instructions
Rev.12/12/2016 Pg. 4
PR-FRC200  
2” Clamp
PR-FRC175 
1.75” Clamp
PR-URM 
2” - 1.5” Clamp