Moxa ZB-PM3-T Benutzerhandbuch

Seite von 12
Software Installation 
After physically installing the Sub-1G module, the module will be recognized on 
the new system board after the following steps. 
 
Steps for Installation 
1.
 
Apply power to the system board. 
2.
 
Run DCU-8620-T application program. Make sure it could communicate with 
Sub-1G module(ZB-WAN1-T and ZB-DCU3-T). 
3.
 
Apply power to the Power Meter. Make sure the LED of “Ready” light-on on 
Power Meter. 
4.
 
Run DCU-8620-T application program, make sure it could read data from 
Power Meter through the air.