3)  Walk thru the Stock Room to determine the best location for one ATA (Transmitter 
Antennae) and two ARA (Receiver Antennae).  If the complete Pre-Install survey was done 
the location is marked by a Yellow Dot for the ATA and Green Dots for the ARA.  
Remember the restrictions in the stock room are the length of the cable from the MEU and 
limited locations on the girders due to the conduit mounted on them.   Transmitters and 
Receivers should be a minimum of 8’ apart. 
 
4)  Verify the phone number for phone line 2.  ( This is the number that the MEU uses to call 
out) 
 
5)  Review with the Cable Installation Vender the selected location for all of the equipment to 
be installed and the location of the phone block and the MEU.  If done during your walk 
through this may be able to be eliminated. 
 
6)  Verify that you have the correct equipment for the installation of this store.  This means 
verify that you have the correct number of ATA, ARA, and cables for this store.  If not 
notify the Help Desk immediately.  You will have provisions in your hot spare kit but this 
will need to be replenished 
 
7)  Give the Cable Installation Vender the phone number for phone line 2.  Make sure they 
know they can not touch the primary phone number for the store. 
 
Quality Assurance: 
During the installation process it is your responsibility to perform the following QA tasks: 
 
1)  Verify that the work area is kept as clean as possible.  Make sure that it is not a hazard to 
the Stores employees or customers. 
 
2)  Verify that the Cable Install Vender is compliant with Goliath Solutions’ and the Retailers 
wiring standards. 
 
3)  Verify that work areas are cleaned up after the Cable Install Vendor is complete in that area 
of the store. 
 
4)  Verify that push pins, dots and dry erase marks are removed from the ceiling or the floor of 
the store and replaced with the labels provided by Goliath Solutions.  Examples are found 
in the Cable Installation & MEU Activation Manual. 
 