RadioFrame Networks Inc MCRB10 Benutzerhandbuch

Seite von 167
MC-Series System Installation & Testing 
Final Checkout and Commissioning 
RadioFrame Networks, Inc.
  
47 
5 Final 
Checkout 
and 
Commissioning 
The procedures in this chapter describe procedures for conducting final checkout for each portion 
of the MC-Series System. This chapter's describes procedures for: 
• Prerequisites 
• Checkout 
procedures 
• Final 
checkout 
setup 
• Initial 
power 
• System 
setup 
• System 
verification 
• Functionality 
test 
 
5.1 Prerequisites 
Ensure that the following has taken place: 
•  The T1 is live and has been tested 
•  The datafill has been completed, including BR cabinet and position assignments, and 
conforms to the recommended datafill shown in section 6.3 Recommended Datafill 
Parameters 
•  Site configuration is available 
•  All cabling and installation work has been completed and all punchlist items corrected 
 
Required Tools: 
•  R2660 Series Communication System Analyzer 
• Digital 
RF 
meter 
•  Laptop computer to bring up the MC-Series System. At a minimum, the laptop must be 
loaded with the following fully functional equipment (or equivalent): 
ƒ
 
Pentium II / 233MHz (Pentium III / 500 MHz recommended, or better) 
ƒ
 
128MB of memory (256MB recommended) 
ƒ
 
10GB hard drive (64MB disk drive space minimum available for software) 
ƒ
 
12x (or faster) CD-ROM (USB memory stick with 64MB recommended) 
ƒ
 
Windows 98 (Windows 2000 Professional or better recommended) 
ƒ
 
Internet Explorer 5.5 (no Mozilla) 
•  One Ethernet port and one 9-pin serial port 
•  6-foot CAT5 (or 5e/6) Ethernet cable (EIA/TIA 568B) to connect to the BIC CRIC 
•  Straight-through, male-to-female serial cable (DB9/RS232) 
•  50 ohm terminating loads for all RF ports to be used according to the site configuration