ZTE Corporation BS8800C200 Benutzerhandbuch

Seite von 167
ZXSDR BS8800 C200 Installation Manual
Unpacking Acceptance
Counting Goods
Prerequisite
The transported cargo should have reached the installation site.
Context
The representative of customer and the project supervisor must be
present on site during counting of goods received. If any party is
not present at that time, transporter must hold the responsibility
for any difference in goods.
The steps involved in counting goods are as follows:
Steps
1. Check Delivery Checklist of ZTE Corporation. Check total num-
ber of goods, intactness of packing boxes, and check whether
arrival place is the actual installation place against packing list
number attached to packing boxes. If goods are intact, start
to unpack and inspect them.
Note:
It is recommended to unpack the goods after about 30 minutes
of receiving the cargo, since there is a possibility of moisture
content due to temperature variations if any.
2. Equipment inspection list and unpacking acceptance report are
present in the first packing carton. Firstly, open first packing
carton and take out the Unpacking Acceptance Report to check
whether the goods received are in accordance with the inspec-
tion list.
3. During the counting and unpacking inspection process, if any
material is found short, or goods damaged, then fill-in Unpack-
ing Acceptance Feedback Table 
and contact ZTE promptly.
E
ND OF STEPS
.
Crate Unpacking
Prerequisite
Prepare the appropriate tools such as straight screwdriver, pliers,
and crowbar.
Context
Perform the following steps to open the crate:
Steps
1. Insert a straight screwdriver into the slit between crate and
front cover board to make it loose; then insert crowbar to un-
clench cover board.
2. Pull the cover board out from the crate.
3. Remove the other boards of the crate, as shown in
20
Confidential and Proprietary Information of ZTE CORPORATION