ZTE Corporation R8964S26H Benutzerhandbuch

Seite von 27
ZXSDR R8964 User Manual
5.2 Replacing PE Cable
Prerequisite
Make sure that the length of the new PE cable is the same as that of the old grounding
cable.
Make sure that services are not affected during the replacement.
Context
The basic grounding net project and tower of the grounding system, the grounding
project of the building, and connection points of the indoor/outdoor copper ground bar are
constructed by customers. The field engineering personnel need to install the protection
earth (PE) cable to the cabinet shell of the ZXSDR R8964.
Steps
1.
Loosen screws on the two ends of the PE cable and then remove the cable.
2.
Crimp the copper lug of one end of the PE cable to the protection grounding terminal
of the ZXSDR R8964 cabinet.
3.
Crimp the copper lug of the other end of the PE cable to the grounding bar.
4.
Use multimeter to test the grounding resistance. The joint grounding resistance must
be less than 5 ohms.
5.
Clean up the field.
– End of Steps –
5.3 Replacing Optical Fiber
Prerequisite
l
Perform fault observation and analysis to confirm that the optical fiber should be
replaced.
l
Select the optical fiber with the proper length, and check whether the type of the new
optical fiber is the same as that of the old optical fiber to be replaced.
l
Record the connection position of the optical fiber to be replaced, the new optical fiber
should be connected at the original position.
l
Prepare the moisture-proof bag and certain labels for marking.
Context
When replacing an optical fiber, pay attention to the following:
l
During operations, do not damage the optical fiber cladding.
l
Protect optical fiber connectors to avoid contaminating them.
l
Do not forcibly pull out the original optical fiber or forcibly bundle the new optical fiber.
5-2
SJ-20110921170448-002|2013-09-12(R1.0)
ZTE Proprietary and Confidential