ZTE Corporation ZXMBW-RA25 Benutzerhandbuch

Seite von 99
 
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual 
 
18      
Confidential and Proprietary Information of ZTE CORPORATION 
 
1. Plain washer  2. Support  3. Bolt  4. M12 nut, spring washer, plain 
washer 5. Pole  6. Fastening plate 
E
ND OF STEPS
 
 
Note:
 The diameter of the post is usually 60 mm ~ 90 mm, with 
75 mm recommended.  
 
Sunshade Component Installation 
As shown in Figure 7, fasten the sunshade onto the support with 
four M4 bolts.  
F
I G U R E  
7
 
S
U N S H A D E  
I
N S T A L L E D  
- P
O L E  
M
O U N T I N G
 
 
 
Chassis Body Installation 
For installing the chassis body, perform the following steps: 
 
1.  Lift the chassis body and hang the upper part of the chassis 
onto the support component, as shown in Figure 8;