ZTE Corporation ZXMBW-RA25 Benutzerhandbuch

Seite von 99
 
 
Chapter 4 Power and Grounding Cables Installation 
 
Confidential and Proprietary Information of ZTE CORPORATION      29 
 
Note:
  As shown in  Figure  19, the section within 60 mm on the 
right of the waterproof connector  must be wrapped with conducted 
fabric in full shielding.
 
2.  110 V AC power cable of the RA25 chassis 
The 110  V AC power cable have the same structure and 
pinouts as the 220 V cable.  
3.  -48 V DC power cable of the RA25 chassis 
Usually, the RA25 equipment is provided with a 10 m Dc 
power cable. A ready cable can be provided by ZTE according 
to the on-site survey data. Alternatively, it can also be made 
on site as needed.  
Figure 20 shows the structure of the DC power cable. 
F
I G U R E  
2 0
 
D C
 
P
O W E R  
C
A B L E  
S
T R U C T U R E
 
 
 
Note:
 On End A are three fully insulated chip terminals. End B is 
crimped with the appropriate type of wiring terminal, according to the 
port type of the air switch of the user power distribution cabinet.
 
Table  9 shows the pinouts of the cable. For easy 
identification, end A is referred to as A1, A2, and A3 
respectively, corresponding to cores of different colors.  
T
A B L E  
9
 
- 4 8 V
 
D C
 
P
O W E R  
C
A B L E  
P
I N O U T S  
 
Connector Name  Core Color 
Description 
End A1 
Blue 
-48 V 
End A2 
Brown 
-48 VGND 
End A 
End A3 
Yellow/green 
PE (protective earth) 
 
 
Note:
 When the chassis of the equipment is mounted indoors, the 
power cable must be protected with PVC tubes.  
 
4.  Fan power cable in the RA25 chassis