CommScope Technologies LLC RP-A2014 Benutzerhandbuch

Seite von 70
Chapter 3 Baseband Controller installation 
3-2
913020 10.05 April 2015
D
R
A
F
T
Preparing for Baseband Controller installation
Open the shipping box. It should have the components for one complete Controller 
Unit:
Chassis – including four mounting screws
Controller Unit (CU) 
Power Fan Unit (PFU)
The Baseband Controller is 1U high. Be sure there is enough room for the Controller 
Unit in the rack.
Installing the Controller Module into a rack
CAUTION
The controller, when mounted, must in the horizontal position. No other 
orientations are allowed.
NOTE
The chassis requires four screws to secure it into the rack. 
1
Slide the chassis into the rack. 
2
Line up the holes in the chassis ears to the holes in the rack.