Huawei Technologies Co. Ltd PRRU3911 Benutzerhandbuch

Seite von 249
2.1 Reference Documents
Before the installation, you must read the following documents:
l
DBS3900 LampSite Hardware Description
l
Installation Reference
2.2 Preparing Tools and Instruments
This section describes the tools and instruments that must be prepared before the installation.
Marker
Level
Torque screwdriver
 (M4 to M6)
Diagonal pliers
Power cable crimping tool
RJ11 crimping tool
Cable cutter
Rubber mallet
Crown saw (Ø60)
Wire stripper
Hammer drill (Ø6, Ø8 and
Ø12)
Torque wrench (Ø10 mm)
Protective gloves
Guarded blade utility knife
ESD gloves
Long measuring tape
DBS3900 LampSite
Installation Guide
2 Installation Preparations
Issue 07 (2015-12-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6