Huawei Technologies Co. Ltd RRU32612G3 Benutzerhandbuch

Seite von 78
Figure 7-26 Installing a CPRI optical cable
NOTICE
To avoid any damage to optical cables, the cables connected to the RRU must be installed
according to the installation process. For details about the installation process, see 
Step 3 Connect the end labeled 2A and 2B of the optical cable to the optical module on the BBU side.
Step 4 Route the cables according to the instructions in Cabling Requirements, and then use cable ties
to bind the cables.
Step 5 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End
7.11 Installing an RRU Power Cable
This section describes the procedure for installing an RRU power cable.
Prerequisites
l
A tool-less female connector (pressfit type) is added to the RRU power cable on the RRU
side. For details, see 
.
RRU3261
Installation Guide
7 Installing RRU Cables
Issue Draft A (2015-07-24)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
57