Accton Technology ML10G360 Benutzerhandbuch

Seite von 5
–  1  –
Package Contents
 
MetroLinq™ 10G Tri-Band Omni
 
Pole-mount kit — bracket, 8 
bolts,
Tools/Items Required
 
13 mm socket wrench
 
Flat-head screwdriver
 
Ethernet cables
2. Assembly 
Attach the port cover to the base of the unit using the 
included four screws. 
Attach the mounting bracket to the base of the unit using 
four bolts.
Insert four bolts into the holes in the mounting bracket, 
leaving the heads a few millimeters from the bracket.
3. Mount the MetroLinq on a Pole 
Feed the two steel-band clamps through the pole-mount 
bracket mounting points.
Fasten the steel-band clamps around the pole to secure the 
pole-mount bracket to the pole.
3
1
2
1
2
3
4
2
1
3
1
2
Mount the MetroLinq onto the pole-mount bracket.
Tighten the four bolts to secure the MetroLinq.
4. Grounding
Ensure the structure on which the unit is to be mounted is 
properly grounded and in compliance with ETSI ETS 300 253.
Verify that there is a good electrical connection to a 
grounding point (no paint or isolating surface treatment). 
Use the included (M4) screw to attach a grounding wire (not 
included) to the grounding point on the unit, and then to 
ground.
Caution:
 
The earth connection must not be removed 
unless all supply connections have been disconnected.
5. Connect Cables
Connect outdoor-rated Category 5e or better cable to the 
ETH PoE IN RJ-45 port. (The other end of this cable connects 
to the PoE power injector.)
Install a 10G SFP+ transceiver in the SFP+ port, and then 
connect fiber optic cabling to the transceiver. 
The following transceivers are supported:
10GBASE-SR
10GBASE-LR
3
4
1
2
1
2
2
1
1
2
ML-60-10G-360
E122017-CS-R01
ignitenet.com
Q
 
u
 
i
 
c
 
k  
 
S
 
t
 
a
 
r
 
t  
 
G
 
u
 
i
 
d
 
e
Cloud-Enabled Outdoor 60GHz PTMP + 5GHz + 2.4GHz
Model name(HVIN)
:
 
ML-60-10G-360
1. Unpack the MetroLinq