Accton Technology ML60LW Benutzerhandbuch

Seite von 4
–  1  –
Q u i c k   S t a r t   G u i d e
1. Unpack the MetroLinq
Package Contents
MetroLinq
 60 LW (ML-60-LW)
Tools/Items Required
Flat-head screwdriver
Ethernet cables
2. Mount the MetroLinq on a Pole
Slide the pole-mount bracket onto the rails on the back of 
the AP until it snaps into its secured position.
Use the included M3 screw to secure the bracket to the AP.
Feed the two steel-band clamps through the pole-mount 
bracket mounting points.
Fasten the steel-band clamps around the pole to secure the 
AP to the pole.
1
2
1
2
3
3
4
4
3
4
3. Grounding
Ensure the structure on which the unit is to be mounted is 
properly grounded and in compliance with ETSI ETS 300 253.
Verify that there is a good electrical connection to a 
grounding point (no paint or isolating surface treatment). 
Use the included (M4) screw to attach a grounding wire (not 
included) to the grounding point on the unit, and then to 
ground.
Caution:
 
The earth connection must not be removed 
unless all supply connections have been disconnected.
4. Connect Cables
Connect outdoor-rated Category 5e or better cable to the 
RJ45 port. (The other end of this cable connects to the PoE 
power injector.)
Install a 1G SFP transceiver in the SFP port, and then connect 
fiber optic cabling to the transceiver. 
The following transceivers are supported:
1000BASE-SX
1000BASE-LX
5. Connect Power
a. Using the PoE Power Injector
Connect outdoor-rated Category 5e or better cable from the 
MetroLinq to the POE port on the power injector.
1
2
1
2
2
1
1
2
1
2
3
1
E012018-CS-R01
ignitenet.com
Cloud-Enabled Outdoor 60 + 5 + 2.4GHz PTP/PTMP
MetroLinq™ 60 LW