Indyme Solutions Inc CB951 Benutzerhandbuch

Seite von 3
 
Technical Document 
 
CB951 Installation Guide 
Page 1 
P/N 430697-00 Rev C 
CB951 Access Point Installation Guide
 
The CB951 is a multi-band access point designed to decode radio frequency 
transmissions from any of Indyme’s multi-band wireless callboxes. The 
signals are relayed, via the LAN, to an Indyme server for processing. 
Connections to the CB951 will vary depending on the deployed 
configuration. The CB951 can be programmed to function in the 868MHz or 
900MHz frequency spectrum. Check your configuration for details.  
 
Installation 
The CB951 Access Point is a ceiling-mounted device.  Plan the installation 
such that each unit has the clearest possible “line-of-sight” to the largest possible expanse of 
the sales floor. The CB951 Access Point must be programmed before installation. Confirm the 
correct antenna is installed and all operational parameters have been set prior to installing the 
CB951 Access Points. Each unit will require power; this can be supplied via P.O.E. or external 
power supply to each unit. (12VDC, 500mA, positive tip, 2.5mm – SOLD SEPARATELY). 
Tools Needed: 
•  Drill and assorted Drill Bits 
•  Assorted Screwdrivers (Phillips and Flat Blade) 
• Wire 
Cutters 
Equipment Needed: 
•  CB951 Access Point 
•  Four (4) pair CAT5 Network Cable 
NOTE
:  
   Grey: 868 MHz Europe 
Yellow: 900 MHz USA/Australia 
 
*  Plan your cable runs to avoid the following potential sources of interference;  
 
 
 
 
DO NOT LAY CABLE ON OR NEAR 
 
 
Fluorescent lighting fixtures, AC power lines, fan motors or RF transmitters. 
 
*  Assure a clear line of sight between the Access Point and installed Callboxes, 
avoiding large metallic objects such as storage racks and air ducting. 
 
*  Leave at least 15 feet of excess cable at the Access Point location, in the 
event that the unit needs to be relocated. 
 
*  Do not bundle the cable with other data cables, as “bleed-over” may occur, 
causing interference.