SECTION 2
INSTALLATION
This section describes unpacking and storage instructions, preliminary tests, tools and materials,
site selection, and installation.
UNPACKING
As with all precision electronic instruments, the CellNet-Ready Pit MIU (ProRead Only) should be
handled with care; however, special handling is unnecessary. Inspect shipping containers for
damage upon receipt and inspect contents of any damaged cartons prior to storage. After
unpacking the MIU, inspect it for damage. If the MIU appears to be damaged, or proves to be
defective upon installation, notify your Schlumberger Sales Representative. If the MIU requires
reshipment, use the original cardboard box and packing material.
STORAGE
Store the cartons in a clean, dry environment. The temperature should remain between -40° and
185°F (-40° and 85°C). Keep in mind that the CellNet-Ready Pit MIU (ProRead Only) has an
internal battery. Storage for more than one year, of the CellNet-Ready Pit MIU (ProRead Only),
may affect product battery life. Be sure to use a first-in first-out inventory control system.
PRELIMINARY TESTS
The CellNet-Ready Pit MIU (ProRead Only) does not require any testing or programming prior to
installation.
TOOLS AND MATERIALS
Tables 2.1 and 2.2 show the recommended tools and materials you may need to successfully install
the CellNet-Ready Pit MIU (ProRead Only) or to replace the MIU’s internal battery. Note that
some items may not apply to your specific installation or the list may not contain all the required
tools and/or materials.
Table 2.1 Recommended Tools
Item Description/Recommended Use
Tool kit contains standard tools including:
 
Assorted screwdrivers
 
Needle-nose pliers