E V O R A   D a t a s h e e t  
P a g e   3   o f   1 0
 
 
 
4.
  Wire the Load Assembly as described in the Wiring Diagrams. Depending on gang assembly using the 
appropriate 10, 12, 14, 16, or 18 AWG wire nut.  
5.
  Push all wires back into the wall box and fasten the control to the wall box using the supplied mounting 
screws. Be sure not to pinch or disconnect any of the wires. 
6.
  Ensure the intended load(s) are connected to the circuit. 
7.
  Replace the fuses in the fuse panel or move the breaker to ON before continuing. 
Note: EVORA self test may require that an I/O map is configured. The following steps are general 
guidance  only.  Installers  should  refer  to  the  property-specific  install  and  commissioning 
documents for further guidance.  
8.
  Allow the EVORA switch to power up. To verify power, observe whether indicator light or backlight 
illuminate or blink. 
9.
  Testing EVORA depends on the specific software configuration.  
10.
  The EVORA User Interface will display start up behavior (refer to the property-specific installation and 
commissioning guide(s) and then enter a self test mode for the first 20 seconds of operation. 
 
 
 
 
 
 
 
 
 
 
Figure 2 Mounting Screw Holes
 
Figure 3 Decora Notch