Physical installation process overview
Overview
This topic delineates the steps involved in the installation of the RRH.
Installation process
Following are the high level steps of the installation process:
1. Verify site preparation is complete
2. Transport the RRH
3. Mount the RRH
4. Ground the RRH
5. Connect user alarm
6. Connect DC power cable
7. Connect RF cables
8. Initial start-up & system test
9. Connect fiber optics cable.
10. Final steps to finish installation.
Tools, materials, and checklist
Preparatory information
Physical installation process overview
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................