Nautel Maine Inc VS300 Benutzerhandbuch

Seite von 133
VS300 Operations and Maintenance Manual
Non-standard maintenance
Page 4-4
Issue 0.1  2011-03-11
3. After a successful load (status is 100% complete and a message indicates a successful load), 
cycle the ac power (turn off, then on) on the VS300.
4. This completes the software upgrade. Restore the former network settings on the transmitter 
and laptop as required (see 
Step 2
 of 
“Transmitter IP configuration” on page 4-2
).
5. Login and repeat 
Step 1
 of 
 to determine if the current 
version is the same as the upgrade version - this confirms the upgrade was successful.
6. If the upgrade was not successful, repeat 
Step 1
 through 
Step 5
. If still unsuccessful, contact 
Nautel.