Invenco Group Ltd G7UPC Benutzerhandbuch

Seite von 67
G7OPT Integrator Manual, DWI-00175 S1 R15
Fig. 2.4:
SDC Removal Tamper (RT) event screen
If this occurs, follow the exception escalation process defined in §2.5.2 Exception Escalation.
2.3.2 Hardware Certification Status
The second test – assuming the device has booted successfully – is to check that its certificates are
loaded and intact.
This test requires the use of TMSlite to query the key-store status using the following steps:
1. Connect the terminal to the workstation that is running TMSlite, with an intermediate protocol
converter such as Invenco’s external application-software controller.
2. (First time only) Click Add, enter the terminal connection details, then click OK.
3. Select the terminal from the left-hand list, click Connect, then select “UPC” from the filter drop-
down list.
4. Scroll down the list and make sure the properties upc.certificate.housekeeping and
upc.certificate.module
are present and not empty. If either property is missing, follow the
exception escalation process defined in §2.5.2 Exception Escalation.
5. Repeat for the SDC by selecting “SDC” from the filter drop-down list, and make sure the properties
sdc.certificate.housekeeping
and sdc.certificate.module are present and non-empty.
Fig. 2.5:
TMSlite – UPC certificate entries (red text example only)
Chapter 2. Shipment Verification
7