Wavetec FZCO WT-AH Benutzerhandbuch
QC Guide of Active Hub
Jul. 13
9
QC Procedure
Test required on 100% of the product
Burn in Test
Connect the DC jack of power adapter with the Active Hub as shown in the figure below and power it “ON”.
Once you power ON the adapter the Power LED’s will turn ON as shown in the figure below.
Power Recycling
Connect the Active Hub with main AC supply.
Turn the unit “ON” and observe that power LED’s turns “ON”.
Now turn “OFF” the unit and wait for 1 second and then turn “ON” and observe that power LED’s turns
Now turn “OFF” the unit and wait for 1 second and then turn “ON” and observe that power LED’s turns
“ON”.
Now turn it “OFF” again, Repeat this procedure 10 times and observe that every time power LED’s turns
“ON”.
Physical Inspection
1- Sharp Edge
Make sure there is no sharp edge at the corners. Check all the corners of top and bottom enclosure.
Also make sure there is no dent or any uneven spot on the metal enclosure. Check the Chassis and also
the top covers before they are fitted.
the top covers before they are fitted.
2- Color is uniform
Make sure color of the Active is uniform and both top and bottom enclosure are matching with each other. Color of
metal casing should be black.
3- Wavetec Logo
Make sure Wavetec Logo on the casing should be uniform and straight; also verify the color with pantone code
“7462C” as well.