General
The installer must ensure that the home standby gen-
erator  has  been  properly  installed. The  system  must 
be  inspected  carefully  following  installation.  All  appli-
cable  codes,  standards  and  regulations  pertaining  to 
such  installations  must  be  strictly  complied  with.  In 
addition,  regulations  established  by  the  Occupational 
Safety  and  Health  Administration  (OSHA)  must  be 
complied with.
Prior  to  initial  startup  of  the  unit,  the  installer  must 
ensure  that  the  engine-generator  has  been  properly 
prepared for use. This includes the following:
•  An  adequate  supply  of  the  correct  fuel  must  be
available for generator operation.
•  The engine must be properly serviced with the rec
-
ommended oil.
Fuel requirementS
With  LP  gas,  use  only  the  vapor  withdrawal  system. 
This  type  of  system  uses  the  vapors  formed  above 
the liquid fuel in the storage tank.
The  engine  has  been  fitted  with  a  fuel  carburetion 
system  that  meets  the  specifications  of  the  1997 
California  Air  Resources  Board  for  tamper-proof  dual 
fuel  systems.  The  unit  will  run  on  natural  gas  or  LP 
gas, but it has been factory set to run on natural gas. 
Should  the  primary  fuel  need  to  be  changed  to  LP 
gas,  the  fuel  system  needs  to  be  reconfigured.  See 
the Reconfiguring the Fuel System section for instruc-
tions on reconfiguration of the fuel system.
Recommended  fuels  should  have  a  Btu  content  of 
at  least  1,000  Btus  per  cubic  foot  for  natural  gas;  or 
at least 2,520 Btus per cubic foot for LP gas. Ask the 
fuel supplier for the Btu content of the fuel.
Required  fuel  pressure  for  natural  gas  is  5  inches  to 
7  inches  water  column  (0.18  to  0.25  psi);  and  for  liq-
uid propane, 10 inches to 12 inches of water column 
(0.36 to 0.43 psi).
note:  all  pipe  sizing,  construction  and  layout 
must comply with nFpa 54 for natural gas applica-
tions and nFpa 58 for liquid propane applications. 
once  the  generator  is  installed,  verify  that  the 
fuel pressure neVer drops below four (4) inches 
water  column  for  natural  gas  or  10  inches  water 
column for liquid propane.
Prior  to  installation  of  the  generator,  the  installer 
should consult local fuel suppliers or the fire marshal 
to check codes and regulations for proper installation. 
Local  codes  will  mandate  correct  routing  of  gaseous 
fuel  line  piping  around  gardens,  shrubs  and  other 
landscaping to prevent any damage.
Special  considerations  should  be  given  when  install-
ing  the  unit  where  local  conditions  include  flood-
ing,  tornados,  hurricanes,  earthquakes  and  unstable 
ground  for  the  flexibility  and  strength  of  piping  and 
their connections.
Use  an  approved  pipe  sealant  or  joint  compound  on 
all threaded fitting.
All  installed  gaseous  fuel  piping  must  be  purged  and 
leak  tested  prior  to  initial  start-up  in  accordance  with 
local codes, standards and regulations.
Fuel conSumption
The  fuel  consumption  rates  are  listed  in  the 
SPECIFICATIONS section at the front of this manual.
 BTU FLOW REqUIREMENTS - NATURAL GAS:
BTU  flow  required  for  each  unit  based  on  1000  BTU 
per cubic foot.
7 kW - 
140,000 BTU/Hour
9 kW - 
156,000 BTU/Hour
12 kW - 
215,000 BTU/Hour
13 kW - 
220,000 BTU/Hour
16 kW - 
261,000 BTU/Hour
18 kW - 
294,000 BTU/Hour
DANGER
$
   Gaseous fuels such as natural gas and liquid 
propane (lP) gas are highly explosive. Even 
the slightest spark can ignite such fuels and 
cause an explosion. No leakage of fuel is per-
mitted. Natural gas, which is lighter than air, 
tends to collect in high areas. lP gas is heavi-
er than air and tends to settle in low areas.
note:  a  minimum  of  one  approved  manual  shut-
off  valve  must  be  installed  in  the  gaseous  fuel 
supply  line. the  valve  must  be  easily  accessible. 
local codes determine the proper location.
reconFiGurinG the Fuel SyStem
8 kW, 410CC ENGINE:
To  reconfigure  the  fuel  system  from  NG  to  LP,  follow 
these steps (Figure 1):
note: the primary regulator for the propane sup-
ply  is  not  included  with  the  generator.  a  fuel 
pressure of 10 to 12 inches of water column (0.36 
to 0.43 psi) to the fuel inlet of the generator must 
be supplied.
1.  Turn off the main gas supply (if connected).
2.  Open the roof and remove the door.
3.  Remove the battery (if installed).
4.  Locate the plastic T-handle fuel selector in the poly bag 
supplied with the generator.
5.  Locate  the  selector  knob  on  the  air  box  cover,  behind 
the  yellow  air  filter  door  and  power  bulge. The  unit 
comes from the factory in the NG (Natural Gas) position. 
Grasping the T-handle, insert the pin end into the hole 
Part 1
GENERAL INFORMATION
sEctioN 1.4
PrEParatioN BEforE usE
Page 16