GE ZBD7000 Benutzerhandbuch

Seite von 16
Installation Preparation
MATERIALS YOU WILL NEED:
Materials Required for All Installations
¨ 90
°
 Elbow (3/8”NPT external thread on one end, opposite
end sized to fit water supply)
Note: Use new ferrule. Do not use old parts.
¨ Strain relief for electrical connection
¨ Thread seal tape
¨ UL Listed wire connectors (3)
¨ Screw type hose clamps
Materials For New Installations Only:
¨ Air gap for drain hose, if required
¨ Waste tee for house plumbing, if applicable
¨ Electrical cable or power cord, if applicable
¨ Hand shut-off valve (recommended)
¨ Water line 3/8” min. copper or 1/2” min. plastic (plastic
must be tested for temperature and pressure)
¨ Coupler for extending drain line,  if applicable
4
90
°
 Elbow
Thread Seal
Tape
Wire Nuts
Screw Type Clamps
Waste Tee
Shut-Off
Valve
Electrical Cable
or Power Cord
Air
Gap
Coupler
Hot Water Line
TOOLS YOU WILL NEED:
Tools Required for All Installations
¨ Phillips  head and flat blade screwdrivers
¨ 3/8”, 5/16” and 1/4” nutdrivers
¨ Level
¨ Carpenters square
¨ Measuring tape
¨ Safety glasses
¨ Flashlight
¨ Bucket to catch water when flushing the line
¨ Tubing cutter
¨ Gloves to protect against sharp edges
¨ Wire strippers
For New Installations Only:
¨ Drill and appropriate bits
¨ Hole saw set
Flat Blade Screwdriver
Flashlight
Bucket
Level
Phillips  Head
Screwdriver
Safety Glasses
Hole
Saw Set
Square
Tubing
Cutter
Adjustable
Wrench
Measuring Tape
Gloves
Nut Driver
Drill
and Bits
Strain Relief
Wire Strippers