HP ProLiant x64 Windows Unified Data Storage Server OS Upgrade T5322A Merkblatt

Produktcode
T5322A
Seite von 14
6
 
 
 
Confirm resources failover
 
1. 
After the iSCSI Software Target resource comes online, expand the Groups list in the left pane. 
Right-click Group 0 and select Move Group. Ensure that all Group 0 resources are successfully 
moved over to Node 2. 
2. 
Repeat the Move Group operation for Group 1 and the Cluster Group. Verify that all Group 0, 
Group 1, and Cluster Group resources have successfully moved over to Node 2 and that Node 2 
is now the active node with full control of all cluster resources. 
3. 
Move Group 0, Group 1, and the Cluster Group back to Node 1. Verify that Node 1 is now the 
active node with full control of all cluster resources. 
 
Note 
Microsoft recommends shutting down all nodes in the cluster 
one at a time and bringing them back online in order to 
confirm the successful failover of cluster resources. Moving 
the resource groups allows you to test the failover of 
resources without completely taking cluster nodes offline.