Foster KS 90 2409 000 Benutzerhandbuch
Produktcode
2409 000
313
Hoods
A hood for every kitchen
A really complete range, with every kind of hood. Non only different looks, but also different functioning principles, in order to be able
to choose the hood which fits each one’s needs.
to choose the hood which fits each one’s needs.
Wall-mount hoods
A large range of choices in size, shape, materials and
functionality.
functionality.
Ceiling-mount suction systems
These are not mere hoods for aspiring cooking fumes,
but complete ventilation systems, engineered to
improve the quality of the air and the comfort of your
living space.
but complete ventilation systems, engineered to
improve the quality of the air and the comfort of your
living space.
Built-in hoods
These special solutions are craftily studied to disappear
within the kitchen cabinets, nevertheless maintaining
their own personality and great functionality.
within the kitchen cabinets, nevertheless maintaining
their own personality and great functionality.
Island hoods
For many models an island version is also available.
These hoods are easy to install thanks to the telescopic
chimneys.
These hoods are easy to install thanks to the telescopic
chimneys.
Table hoods
Elegant and minimalistic solutions which perfectly
match the Domino and In-line cooker hobs, both gas
and induction.
match the Domino and In-line cooker hobs, both gas
and induction.
Custom-made hoods
Foster specialises in tailor-made solutions. As for the
worktops, also for the hoods Foster is able to manufacture
custom-made products according to the customer’s
drawing, always guaranteeing the best match between
worktop and cooker hood, in terms both of design and
kind and finish of steel (a preliminary analysis, study and
approval of the project is necessary).
worktops, also for the hoods Foster is able to manufacture
custom-made products according to the customer’s
drawing, always guaranteeing the best match between
worktop and cooker hood, in terms both of design and
kind and finish of steel (a preliminary analysis, study and
approval of the project is necessary).