Elite Screens Q100VD Benutzerhandbuch

Seite von 10
 
Rev043010-JA
 
 
info@elitescreens.com 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Three Section Frame 
(For large presentation screens that are 120” or more in diagonal 
measurement) 
 
1.  Take  the  frame  out  of  the  case  and  remove  its 
wrappings.  Unfold  the  main  joints  making  sure  that 
both the end and middle spans are in prefect alignment 
as shown in (fig 4). 
2.  Make sure that the snap latches have locked the joints in 
the frame so that it is at its full horizontal extension as 
shown in (fig 5) 
3.  While holding the bottom of the frame in place, lift the 
top of the frame to unfold the sides which will cause the 
snap  latches  lock  when  fully  extended.  Secure  the 
corner braces into the locked position. The screen frame 
should now be fully opened as in (fig 6). 
 
 
fig 6
Lock down the corners
Snap latch
Snap latch
Top
 
fig 4