Texas Instruments bq24180EVM - Evaluation Module for BQ24180 Fully Integrated Switch-Mode 1-Cell Li-Ion Charger BQ24180E BQ24180EVM Datenbogen

Produktcode
BQ24180EVM
Seite von 15
To Computer
USB port
10 - pin
Ribbon Cable
To EVM
T
exasInstruments
©2006
USB
USBInterface
Adapter
I/O
Equipment Setup
2.4
Computer
A computer with at least one USB port and a USB cable. The bq24180 evaluation software must be
properly installed.
2.5
HPA172 Communication Kit
A HPA172 USB to I
2
C communication kit.
2.6
Software
1.0 BQ24180A_Gui_Software.zip
Double-click on the SETUP.EXE file. Follow the installation steps.
3
Equipment Setup
1. Set PS#1 for 5 V
±
100 mVdc, 1.7
±
0.1-A current limit and then turn off supply. Connect the output of
PS#1 to J1 (DC+, DC
).
2. If simulated battery circuit is used in place of a battery, set the PS#2 for 3.5 V
±
100 mVdc, 1.8
±
0.1-A
current limit and then turn off supply.
3. Connect the battery (discharged to ~3.1 V) or simulated battery load to J2 as shown in
If
simulated load is used, connect the output of PS#2 (+ lead) to the anode of the simulated load and
return to ground (DC
).
4. Connect the system load to J3 (DCOUT, GND).
5. Connect digital multimeter 1 (DMM#1) across J2 (BAT+, GND), and set to measure DCV (5-V range).
6. Connect DMM#2 across BAT
Sense Resistor (0.1
Ω
,
2 W), and set to measure mVdc (
<
300-mV
range).
7. Connect DMM#3 across the J3 (DCOUT, GND), and set to measure DCV (5-V range).
8. Connect J4 to HPA172 kit by 10-pin ribbon cable. Connect the USB port of the HPA172 kit to the USB
port of the computer. The connections are shown in
.
Figure 1. Connections of HPA172 Kit
9. Install jumpers JMP1-2/3 (CD, GND); JMP2-1/2 (PSEL, HI); JMP3-1/2 (LED); JMP4-2/3 (TS_4.7k,
GND)
10. Connect scope to TP9 and set to 2 V/div and 200 ns/div (not shown in setup).
4
bq24180 Evaluation Module
SLUU419A
April 2010
Revised April 2011
Copyright
©
2010
2011, Texas Instruments Incorporated