Texas Instruments Simple -48V Hot Swap Controller EVM TPS2393EVM TPS2393EVM Datenbogen

Produktcode
TPS2393EVM
Seite von 20
SLUU155 – March 2003
4
Full-Featured –48-V Hot Swap Power Manager
Full-Featured –48-V Hot Swap Power Manager
(TPS2392 and TPS2393)
Andy Ripanti
Power Interface Products
ABSTRACT
The TPS2392 and TPS2393 integrated circuits are hot swap power managers optimized for use in
nominal –48-V systems. They operate over a supply voltage range of –20 V to –80 V, and are rated
to withstand spikes to –100 V. In conjunction with an external N-channel FET and sense resistor, they
can be used to enable live insertion of plug-in cards and modules in powered systems. Each device
provides load current slew rate control and peak magnitude limiting. Undervoltage and overvoltage
shutdown thresholds are easily programmed via a three-resistor divider network.
Contents
1
Introduction
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
1.1 Features
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
1.2 Description
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2
The Full-Featured –48-V Hot Swap Controller EVM Kit
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.1 The Full-Featured –48-V Hot Swap Controller EVM Main Board
6
. . . . . . . . . . . . . . . . . . . . . . . . 
2.1.1
Module Description
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.1.2
EVM Schematic Diagram and List of Materials
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.2 The Full-Featured –48-V Hot Swap EVM Jumper Card
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.2.1
Description
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.2.2
Jumper Card Schematic Diagram
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
2.3 Full-Featured –48-V Hot Swap EVM Operating Specifications
12
. . . . . . . . . . . . . . . . . . . . . . . . . 
3
Getting Started
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
3.1 Equipment Requirements
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
3.2 Verifying the EVM Operation
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
3.2.1
Equipment Setup
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
3.2.2
Functional Test
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4
Using the EVM Kit to Evaluate the TPS2392 and TPS2393
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.1 Supply Connections and Test Points
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.2 Load Capacitors
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.3 Changing the Current Limit Threshold
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.4 Changing the Inrush Slew Rate
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.5 Fault Timing With the TPS2392/93
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
4.6 Programming the UVLO and OVLO Thresholds and Hysteresis
18
. . . . . . . . . . . . . . . . . . . . . . . . 
4.7 TPS2392/93 Powergood Output (PG)
19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .