Tandberg Data StorageLibrary T40+, 24 slots, 1xLTO-3 8136-LTO Benutzerhandbuch

Produktcode
8136-LTO
Seite von 105
 
StorageLibrary Installation and User Guide 
3
 Unpacking the StorageLibrary 
This chapter provides detailed information for preparing the library location.  
 
 Caution 
After the library is unpacked it needs to acclimatise for 8 hours before the power 
is turned on. 
 
Finding a Location for the StorageLibrary 
 
The StorageLibrary must be located in a stable environment. 
 
The StorageLibrary is designed to operate in a horizontal position. Do not attempt to operate the 
StorageLibrary in any other position than horizontally. 
 
Make sure a power source is available (On StorageLibrary with redundant power you need two 
power sources). 
 
Route any cable to avoid walking on them or pinching them with items placed on or against them.  
Pay particular attention to the cord at the wall plug, and the point where the cord exits from the 
StorageLibrary. 
 
Make sure that objects will not fall and liquids will not spill into the chassis openings of the 
StorageLibrary. 
 
Make sure the airflow around the front and back of the StorageLibrary is not obstructed. 
 
Make sure there is a minimum of 60 cm (24 inch) free space in front of the unit to allow the 
operator to safely remove the magazines. 
 
Make sure the display and operator controls can easily be accessed. 
 
Make sure the StorageLibrary is away from the floor and in a clean environment with 
temperatures within specifications. See 
Unpacking 
 Caution 
You must remove the transport locking screws when powering up the unit 
for the first time or it will not operate. This procedure is described in the 
 chapter.