Gw Instek PEL-3111 Electronic Load PEL-3111 Datenbogen

Produktcode
PEL-3111
Seite von 119
 
OPERATION 
101 
Sequence 1
STEP 01
STEP 02
:
STEP N
Sequence 2
STEP 01
STEP 02
:
STEP N
Sequence 10
STEP 01
STEP 02
:
STEP N
 
 
 
Start Sequence
:  
:
:
:
 
Description 
Normal Sequence configuration is split into 
Timing Edit configuration and Data Edit 
configuration.  
Timing Edit configuration is used to configure 
the actual sequences, such as mode, range, 
loops and chains. 
Data Edit configuration is used to create the 
actual steps used in each sequence. 
See below for a description of each. 
Timing Edit 
Overview 
A Normal Sequence contains the following 
timing settings for each sequence: 
 
 
 
Setting 
 
Setting Range 
Description 
Start 
S01 ~ S10 
Sets which sequence is used 
to start a chain of Normal 
Sequences. 
Seq.No 
S01 ~ S10 
Sets the current sequence to 
edit.