Utica Boilers SSV Installationsanweisungen

Seite von 88
2
Description
Item
No.
Illustration
Fully Assembled Boiler
1
Metal Wall Bracket
2
Lag Bolt, 3/8" x 3" Hex (4 ea)
3
*Safety Relief Valve 
4
Condensate Trap 
Height 12.45" [316mm]
5
**Temperature Pressure Gauge
6
Bushing 3/4" x 1/4"
7
3/4" FNPT Adapter
8
3/4" Tee 
50/75/100
1"x 1" x 3/4" Reducing 
Tee 150/200
9
3/4" Tee
50/75/100
1"x 1" x 3/4" Reducing 
Tee 150/200
10
3/4" FNPT Adapter 
11
Drain Valve, 3/4"
12
1/2" Gas Shutoff Valve 50/75/100
3/4" Gas Shutoff Valve with Increaser 
and Nipple 150/200                 
13
050/75/100
150/200
Bushing 7/8" OD, Heyco (2 ea)
14
Used for electrical wire knockouts.
Stopper, Rubber 5/16" (2 ea)
15
Used for packaging holes on back of boiler.
Plastic Plug (2 ea)
16
Used for packaging holes on back of boiler.
Outdoor Sensor
17
Used for measuring outside temperature.
Critical Installation Instruction
18
11" x 17" Page for critical installation issues.
Document Package
19
Includes essential documents.
VERIFY CONTENTS RECEIVED
4
2
3
5
6
8
12
11
7
10
* Boiler provided with 30 psig (206 kpa) safety relief valve. Field source safety relief valve if system pressure greater than 25 psig.
** Boiler provided with 75 psig temperature pressure gauge. Field source temperature pressure gauge if system pressure greater than 60 psig.
 SIZE 
SHOWN 
050/075/100
1
9
13
(shown in open position)
13