HP Performance Optimized Data Center (POD) 20cp Servicehandbuch

Seite von 81
 
Removal and replacement procedures  60 
2. 
Remove the valve (2). 
 
 
Replacing the external pressure gauge isolation valve 
1. 
Insert the new valve (1). 
2. 
Tighten the connection (2).