HP Performance Optimized Data Center (POD) 20cp Servicehandbuch

Seite von 81
 
Periodic maintenance  63 
 
CAUTION: 
 If a serious leak develops, shut down the POD immediately and isolate the chilled 
water cooling system from the site. Contact HP immediately to initiate a field service call. Do not 
attempt to repair the chilled water cooling system. Attempting to self-repair the chilled water 
cooling system during the warranty or service contract period shifts all liability to you. 
  
  
 
IMPORTANT:
  Power down the POD after a leak is detected. 
  
Non-isolable leak detection 
A non-isolable leak is a leak from the main supply line or the return header. 
To repair a non-isolable leak: 
1. 
Power down all IT equipment. 
2. 
Re-direct the leaking water away from the IT equipment. 
3. 
Repair the leak or contact HP if you are still within your service contract. 
Isolable leak detection 
An isolable leak is any type of leak that does not occur from the main supply line or the return header. 
To repair an isolable leak: 
1. 
Inspect the zone indicated on the ECS Status Overview screen. You might need to inspect each zone 
condensate drain pan to determine the exact location of the leak. 
2. 
Power down the IT equipment in the zone where the leak is located. 
3. 
Determine the affected heat exchanger. 
4. 
Close and danger tag the supply and return valves to the affected heat exchanger. 
If the heat affected exchanger cannot be identified, close all the heat exchanger supply and return 
valves in the affected zone and open one supply valve at a time to determine the location of the leak. 
5. 
Repair the leak or contact HP if you are still within your service contract. 
 
Humidifier (if installed) 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Humidifier 
 
Inspect for water leaks, verify 
that no sparks form between 
the electrodes during 
operation 
 
Inspect the general operation 
of the cylinder. 
 
Bi-weekly, if 
staffed 
 
Quarterly, if 
not staffed 
Qualified personnel 
Humidifier drains 
Verify the following: 
 
Drains are in working order 
 
There is an air gap at the 
funnel/drain entry into the site 
system 
 
Drain discharge is not getting 
water on external equipment 
or grounding system 
Quarterly 
Qualified personnel