Henkel LOCTITE 97504 Benutzerhandbuch

Seite von 94
56 
 
2    Safety  
2.8 
Preparation for Operation – Visual Inspection 
Perform a visual inspection of the dispensing station every day before you start to 
work and before each change of shift. If there are any doubts regarding correct 
operational capability, the system must be shut down immediately and presented to 
qualified staff for inspection before operation is continued. 
2.9 
Safeguard Against Unauthorised Use  
An effective safeguard against unauthorised use can be achieved by 
–  Removing the power cord, and 
–  Removing the fuse plug (from power switch). 
In addition to any action taken, position a clearly visible and legible written notice, 
e.g. on the power switch, to prohibit operation of the unit.