Henkel LOCTITE 97504 Benutzerhandbuch

Seite von 94
60 
 
3    Operation 
3.3.4 
Initial priming with product 
Preparation 
•  Switch dispensing station off and safeguard against unauthorised use. 
•  Disconnect compressed air supply. 
•  Observe safety regulations.  
Positioning of Product Container A 
•  Raise Pump Unit A (D) to top position and hold. 
•  Lightly hand tighten the locking screw (G). Pump unit is locked into place in top 
position. 
•  Insert product container into Receptacle (N) and position underneath Pump Unit A, 
between the 3 centering pins. 
•  Unscrew vent screw (O) from follower plate (S). 
•  Hold Pump Unit A and back off locking screw (G). 
•  Lower the pump unit slowly until follower plate rests against the container rim. 
•  Gently press down with your hand to lower Pump Unit A until product flows from 
bleed port (Z). 
•  Lightly hand tightens the locking screw. Pump unit is locked into place. 
•  Screw vent screw into the bleed port of the follower plate. 
•  Back off locking screw. Pump Unit A rests by its own weight on top of the product.  
 
 
 
Crush hazard: Risk of fingers getting crushed when pump unit is 
lowered. Do not allow fingers to get between follower plate and 
receptacle and/or product container.