Utica Boilers SSC Installationsanweisungen

Seite von 84
2
VERIFY CONTENTS RECEIVED
Description
Item
No.
Illustration
Fully Assembled Boiler
1
Metal Wall Bracket
2
Lag Bolt, 3/8" x 3" Hex (4 ea)
3
*Safety Relief Valve 
4
3/4" Tee
5
3/4" Nipple
6
3/4" x 1/4" Elbow
7
Air Vent
8
**Temperature Pressure Gauge
9
Bushing 3/4" x 1/4"
10
3/4" Tee (Same as No. 11)
11
Nipple 1¼ x 5½ 
12
Drain Valve, 3/4"
13
3/4" Tee
14
Nipple 1¼ x 5½ 
15
Bushing 7/8" OD, Heyco (2 ea)
16
Used for electrical wire knockouts.
Stopper, Rubber 5/16" (2 ea)
17
Used for packaging holes on back of boiler.
Plastic Plug (2 ea)
18
Used for packaging holes on back of boiler.
Outdoor Sensor
19
Used for measuring outside temperature.
Critical Installation Instruction
20
11" x 17" Page for critical installation issues.
Document Package
21
Includes essential documents.
4
5
6
7
8
2
3
9
10
12
13
14
11
15
* Boiler provided with 30 psig (206 kpa) safety relief valve. Field source safety relief valve if system pressure 
greater than 25 psig.
** Boiler provided with 75 psig temperature pressure gauge. Field source temperature pressure gauge if system 
pressure greater than 60 psig.
299 SIZE 
SHOWN