storage & Handling
Your panels will usually arrive on a flatbed 
truck.  Depending on the site, panels should be 
off-loaded to a clean, flat area with sufficient 
maneuvering room.  (A fork-lift will speed the 
off-load process.) 
Panels do not come in any particular order.  This 
allows for minimized shipping costs by taking 
full advantage of the space available on the 
truck.  It is advisable to sort the panels as you 
off load them. This process will require room to 
shift and stack the panels accordingly. 
Sort and stack all of the panels by panel ID 
number and move them as close to their final 
location as possible.  Place at least three 
stickers a maximum of 4’ on center (o.c.) under 
the panel stacks to ensure that the panels 
remain flat.  The stickers should be a minimum 
of 3 ½” wide.
Inventory the panels as you off-load them.  
If one is missing or damaged call PBS 
immediately.  We will work to correct the 
problem as soon as possible. 
Remember, you are working with a wood product 
that may swell after prolonged exposure to 
moisture.  Keep all panels and accessories 
protected from the elements prior to installation.   
If splines swell, installation may be hampered.