9600 Compressor Installation, Operation, and Maintenance
P/N 8040540
4-1
C
HELIX  TECHNOLOGY  CORPORATION
-
TI
CRYOGENICS
Section 4 - Operation
Adjusting System Helium Pressure
Your CTI-CRYOGENICS high vacuum pump system is comprised of 
several pressurized components i.e. compressor, flex lines, and cryopumps. 
Each component is charged with helium before shipment.  After all 
cryopumps, helium lines, and manifolds are attached to the compressor, the 
system static helium charge pressure must be verified before system 
operation.  Once the static helium system pressure has been verified, the 
system is ready for operation. After cooldown, the normal system 
operating pressure
 is recorded. 
NOTE: The 9600 Compressor is designed for continuous operation and 
should remain ON even when the cryopumps are in a regeneration cycle.
Static Helium System Pressure Verification
The proper system static helium charge pressure is necessary so that the 
cryopumps operate at maximum performance as well as to assure that the 
compressor will operate below the maximum design motor winding 
temperature which will maximize the life of the compressor motor. 
1. Make sure the Compressor and Cryopump(s) are OFF.
2. Make sure all system components are connected together as 
described in Section 3 - Installation.
3. Allow all system components to acclimate to a temperature 
between 60º F and 80º F (15.5º C - 26.6º C). 
4. Read the compressor helium pressure gauge located on the com-
pressor rear panel as shown in Figure 1-4.  Compare the gauge 
reading to the appropriate 50/60 Hz line frequency value (depend-
ing upon your system installation) indicated in Table 4-1.
Table 4-1: 9600 Compressor Helium Static Charge
Line Frequency
Helium Static Charge Pressure
60 Hz
240 - 250 psig (16.5 - 17.2 bars ) 
50 Hz
255 - 265 psig ( 17.6 -18.3 bars )