Namco Bandai Games Utility Trailer 90500013 Benutzerhandbuch

Seite von 87
Page 48
6-3-3 I/O Test
1.
Select “I/O TEST” on the menu screen to switches and lamps. The
following screen is displayed.
2.
Use the Select Up/Down switch choose the required item then press the
Enter button.
3.
Use the Enter button to change the setting.
4.
Select “EXIT” and press the Enter button to return to the menu screen.
(a)
Shows the condition of the DIP Switches on the PCB. In normal operation
all switches are OFF. (If a switch is ON, it will be displayed in red.)
(b)
Shows the number of units linked. (1 ~ 4).
If no link data is being received LINK OFF will be displayed.
If unrecognisable data is being received LINK NG will be displayed.
(c)
Selecting this item allows all switches and control pots to be checked.
(See 6-3-3-1 page 49)
(d)
Performs a test on the Handle Motor, Bank Force-Feedback and Air
Springs (
See 6-3-3-2 ‘Motor Test’ page 50)
I/O TEST
DIP 4
12345678 ............................................................. (a)
LINK ON
3 ............................................................................ (b)
SWITCH
.............................................................................. (c)
MOTOR
.............................................................................. (d)
EXIT
ENTER :
CHOOSE :