IBM Partner Pavilion DS4100 Benutzerhandbuch

Seite von 180
8.
   
Use
 
the
 
DS4000
 
Storage
 
Manager
 
client
 
to
 
monitor
 
the
 
status
 
of
 
the
 
new
 
drive
 
and
 
the
 
progress
 
of
 
the
 
data
 
reconstruction.
 
Wait
 
for
 
data
 
reconstruction
 
to
 
finish
 
(the
 
Drive
 
activity
 
LED
 
stops
 
flashing).
 
Note:
  
The
 
Drive
 
activity
 
LED
 
will
 
continue
 
to
 
flash
 
after
 
reconstruction
 
is
 
finished
 
if
 
there
 
is
 
I/O
 
activity
 
to
 
that
 
drive.
 
In
 
that
 
case,
 
use
 
the
 
host
 
software
 
to
 
determine
 
if
 
the
 
data
 
reconstruction
 
is
 
finished.
 
 
9.
   
When
 
reconstruction
 
is
 
finished
 
on
 
the
 
new
 
drive,
 
repeat
 
step
 
through
 
step
 
for
 
each
 
additional
 
drive
 
that
 
you
 
want
 
to
 
install.
 
10.
   
Use
 
the
 
DS4000
 
Storage
 
Manager
 
client
 
to
 
configure
 
the
 
additional
 
space
 
on
 
the
 
new
 
drives.
Working
 
with
 
hot-swap
 
cooling
 
fans
 
The
 
storage
 
server
 
cooling
 
system
 
consists
 
of
 
two
 
fan
 
CRUs,
 
each
 
containing
 
two
 
fans.
 
The
 
fan
 
CRUs
 
circulate
 
air
 
inside
 
the
 
unit
 
by
 
pulling
 
in
 
air
 
through
 
the
 
vents
 
on
 
the
 
front
 
of
 
the
 
drive
 
CRUs
 
and
 
pushing
 
out
 
air
 
through
 
the
 
vents
 
in
 
the
 
back
 
of
 
each
 
fan
 
CRU.
 
See
 
 
If
 
two
 
fans
 
fail,
 
or
 
the
 
fans
 
cannot
 
maintain
 
an
 
internal
 
temperature
 
below
 
70°
 
C
 
(158°
 
F),
 
the
 
power
 
supplies
 
in
 
the
 
unit
 
will
 
automatically
 
shut
 
down
 
(an
 
over-temperature
 
condition).
 
If
 
this
 
occurs,
 
you
 
must
 
cool
 
the
 
unit
 
and
 
restart
 
it.
 
See
 
 
Attention:
  
The
 
fans
 
in
 
the
 
storage
 
server
 
draw
 
in
 
fresh
 
air
 
and
 
force
 
out
 
hot
 
air.
 
These
 
fans
 
are
 
hot-swappable
 
and
 
redundant;
 
however,
 
when
 
one
 
fan
 
fails,
 
you
 
must
 
replace
 
the
 
fan
 
CRU
 
within
 
48
 
hours
 
to
 
maintain
 
redundancy
 
and
 
optimum
 
cooling.
 
When
 
you
 
replace
 
the
 
failed
 
fan
 
CRU,
 
be
 
sure
 
to
 
install
 
the
 
second
 
fan
 
CRU
 
within
 
10
 
minutes
 
to
 
prevent
 
any
 
overheating
 
due
 
to
 
the
 
lack
 
of
 
the
 
additional
 
fan
 
CRU.
 
 
Fan
 
CRUs
 
The
 
two
 
fan
 
CRUs
 
are
 
hot-swappable
 
and
 
redundant.
 
Fault
 
LEDs
 
These
 
amber
 
LEDs
 
light
 
when
 
a
 
fan
 
failure
 
occurs.
Latches
 
and
 
handles
 
Use
 
the
 
latches
 
and
 
handles
 
to
 
remove
 
or
 
install
 
the
 
fan
 
CRUs.
 
Attention:
  
Do
 
not
 
run
 
the
 
storage
 
server
 
without
 
adequate
 
ventilation
 
and
 
cooling,
 
because
 
it
 
might
 
cause
 
damage
 
to
 
the
 
internal
 
components
 
and
 
circuitry.
Fan CRU
Fan CRU
Handle
Handle
Latch
Latch
Fault LED
Fault LED
f10ug024
  
Figure
 
64.
 
Fan
 
locations
 
 
88
 
IBM
 
TotalStorage
 
DS4100
 
Storage
 
Server:
 
Installation,
 
User’s,
 
and
 
Maintenance
 
Guide